Order within 1 day, 11 hours, 21 minutes and select Next Working Day Delivery for delivery on Tuesday
APC Switched Rack Power Distribution Units (PDUs) place rack equipment power control in the hands of the IT Manager. Remote outlet level controls allow power on/off functionality for power recycling to reboot locked-up equipment and to avoid unauthorized use of individual outlets. Power sequencing delays allow users to define the order in which to power up or down attached equipment. Avoid circuit overload during power recovery and extend uptime of critical equipment by prioritizing the load shedding. Current metering provides real-time remote monitoring of connected loads. User-defined alarms warn of potential circuit overloads before critical IT failures occur. Users can access configure and control Switched rack PDUs through secure Web SNMP or Telnet Interfaces and is complimented by APC Centralized Management platforms using InfraStruXure Manager InfraStruXure Central Capacity Manager and Change Manager.
General | |
Model Name | PDU 2G |
Description | Switched rack PDUs provide load metering combined with controlled on/off switching by individual outlets for remote power recycling delayed power sequencing of equipment and outlet use management. |
Barcode | 731304277187 |
Electrical | |
AC Voltage Range | 230 to 400V |
Frequency | 50 to 60Hz |
Maximum Input Current | 16A |
Cable Length | 1.83m |
Compliance | |
Compliance Standards | cUL Listed,EN 55022 Class A,EN 55024,EN 61000-3-2,EN 61000-3-3,FCC Part 15 Class A,ICES-003,UL Listed,VDE |
Interfaces/Ports | |
Input Connections | IEC 309 16A 3P+N+PE ? IEC 309 20A 3P+N+E |
Output Connections | (21) IEC 320 C13 (3) IEC 320 C19 |
Environmental | |
Environmental | Operating Temperature -5 to 45?C - Humidity 5 to 95% |
Physical | |
Form Factor | Rack PDU |
Case Colour | Black |
Dimensions | 5.6cm (W) x 4.6cm (D) x 179.1cm (H) - Weight 7.00kg |
Any Supporting Documents/Files will be listed here.
APC PDU 2G Switched Rack Power Distribution Unit Zero U 16A 230V (21) C13 and (3) C19 hasn't been reviewed yet, why not be the first?